Price:
Area: 6000sqm
Liên hệ: Bất động sản VNREAL
Hotline: 0989776868
Email: Địa chỉ email này đã được bảo vệ từ spam bots, bạn cần kích hoạt Javascript để xem nó.
Capital Tower of Nam Long Development JSC is an B+ Office Building, located at the most beautiful position of Phu My Hung: adjacent Crescent Lake, near the Sai Gon Exhibition & Convention Center (SECC), surrounded by the International Commercial & Financial town.
One can easily connect with the City Central through the Kenh Te Bridge, the Khanh Hoi Bridge, the Nguyen Tri Phuong Bridge, the Tan Thuan Bridge, and the Phu My Bridge.
1. Building information:
- Office building: Grade B
- 1 Basement + 14 Floors
- Net area for lease: 6,000sq.m (Occupancy rate ~ 60%)
- Air-condition: Trane Central air-conditioning system
- Lifts: 3 passengers lifts (Schindler; 2.5m/s; 1.350kgs)& 2 emergency exits
- Curtain wall with Low-E double pane glass
- Parking space: 300 motorbikes + 30 cars
- Back up power system
- Security: 24 hour security
- Floor Loading: 350kg/sq.m
- Public area: Serviced floor - Conference room and coffee shop
- Designed by PTW, Australia
- Construction Management by Delta, America
- Project Management by Viet Han, Taiwan with experiences in managing 5 stars hotel and office building grade A projects.
- Classify as Grade B+ office building
- Modern system of firefighting
- Centre air-conditioned system
- Transition color glass
2. Facilities:
- Coffee shop - net area: 120sq.m
- Conference room - net area: 120sq.m
- This area will be designed as the opened space. It can be combined whenever holding importance event
3. Location:
- Located in International commercial and Financial District of Phu My Hung new urban city, Dist 7. More than 15 banks, 3 insurance company and international groups as Manulife, Fubon Insurance Co.,ltd, Unilever are located in this area.
- Building front faced with Nguyen Khac Vien street (North-East). The back side looked toward Crescent Promenade Area
- Connection with City Central through Kenh Te Bridge, Ong Lanh Bridge, Khanh Hoi bridge, Nguyen Tri Phuong Bridge. It takes only 10 minutes to District 1; 15 minutes to District 5
- Only 15 minutes to get to Binh Chanh district by Nguyễn Văn Linh boulevard, get Mekong Delta by high-way no.1
- When Phu My Bridge is finished, it just takes 10 minutes to get District 2, toward Dong Nai, Binh Duong and Ba Ria Vung Tau Provinces
Hotline: 0989776868
Email: Địa chỉ email này đã được bảo vệ từ spam bots, bạn cần kích hoạt Javascript để xem nó.